Products
D-SUB MALE 9P 180°
Key words:
Classification:
Detail description

1 Scope:
This job specification is only for "D-SUB CONNECTOR".
2. Reference documents:
The following documents are part of the specified specifications. If the requirements of the specifications conflict with the product drawings, the product drawings shall prevail. If the specifications conflict with the reference documents, the specifications shall prevail.
- EIA-364: Test procedures for electronic connectors and connectors.
- UL STD-94: Specifications for testing the flame retardancy of plastic equipment parts and equipment.
3. Requirements:
3.1 Material composition:
Plastic: UL 94V-0 grade.
B. Terminal: copper alloy.
3.2 Design and structure: The product design, structure and size are as shown in the product drawing.
3.3 Rating conditions:
Voltage: 250Vrms max.
Current: 5.0A .
Temperature: -55~105℃
4. Test conditions: This product is designed to meet the electrical, mechanical and environmental performance requirements. As shown in the chart.
5. Test requirements and basic procedures:
|
product inspection |
||||
|
project |
content |
terms |
Test conditions |
judgement standard |
|
1 |
product inspection |
Comply with ARC company drawings and specifications |
visually |
no damage |
|
electrical characteristics |
||||
|
2 |
contact resistance |
THIS IS 364-23 |
Closed circuit 100mA MAX Open circuit 20mV MAX. |
30mΩ max |
|
3 |
Insulation resistance |
THIS IS 364-21 |
500V DC, 60 seconds: test between two adjacent contact points or one contact point to any other contact point. |
5000MΩ min |
|
4 |
Pressure test |
THIS IS 364-20 |
1000V AC, 60 seconds: test between two adjacent contact points or one contact point to any other contact point. |
1. No sparking, no leakage, no rupture. 2. Leakage current <0.5mA |
|
mechanical properties |
||||
|
5 |
fire resistance |
UL 94V-0 |
C card |
The C card identifies the resin UL certification number, batch number, production date, etc. in detail. |
|
6 |
Insertion force test |
THIS IS 364-13 |
Test speed: 25mm/min |
|
|
7 |
fatigue test |
THIS IS 364-09 |
50cycles Plug and play 500cycles/H max |
|
|
8 |
Screw torque test |
|
Dedicated Torque Meter |
|
|
9 |
Tin Wetting Test |
THIS IS 364-52 |
Dipping temperature: 245±5°C Time: 4~5 seconds (without flux) |
Continuous soldering area≧95% |
|
Environmental test |
||||
|
10 |
Temperature and Humidity Test
|
THIS IS 364-31 A |
Temperature: 25~65℃ Humidity: 90~95%(RH) Time: 96H |
1. No damage to the product 2. The electrical properties meet the specification requirements |
|
11 |
Salt spray test |
THIS IS 364-26 A
|
Temperature: 35±2℃ Saline specific gravity: 5±1% Time: 8H
|
1. No damage to the product 2. The electrical properties meet the specification requirements |
|
12 |
High temperature life test |
THIS IS 364-17 A |
Temperature: 105±2℃ Time: 96 hours |
1. No damage to the product 2. The electrical properties meet the specification requirements |
Remarks: After the product is tested, it should meet the visual appearance requirements without damage, and must meet the additional requirements specified in Chapter 6 of the test sequence.
6. Product certification and re-certification sequence:
Sample selection:
Sample selection should comply with the principle of randomness in accordance with the requirements of the structure column.
Test sequence:
The following is an example of the detection sequence:
In test group A8:
First test: 1. Product inspection;
Then perform the test: 2. High temperature life test;
Then execute the test: 3. Product inspection.
|
Test Certification Sequence |
Test items |
|||||||
|
A1 |
A2 |
A3 |
A4 |
A5 |
A6 |
A7 |
A8 |
|
|
product inspection |
1,4 |
1,6 |
1,5 |
1,7 |
1,9 |
1,3 |
1,3 |
1,4 |
|
Contact Resistance Test |
2 |
3,5 |
2,4 |
|
2,6 |
|
|
|
|
Insulation resistance test |
|
|
|
2,5 |
3,7 |
|
|
|
|
Voltage withstand test |
|
|
|
3,6 |
4,8 |
|
|
|
|
Insertion force test |
|
2 |
|
|
|
|
|
|
|
fatigue test |
|
4 |
|
|
|
|
2 |
|
|
Tin dip test |
|
|
|
|
|
2 |
|
|
|
Temperature and Humidity Test |
|
|
|
4 |
|
|
|
|
|
Salt spray test |
|
|
|
|
5 |
|
|
|
|
High temperature life test |
|
|
3 |
|
|
|
|
2
|
|
Screw torque test |
3 |
|
|
|
|
|
|
3 |
|
Samples for each test |
B1 |
B2 |
B3 |
B4 |
B5 |
B6 |
B7 |
B8 |
illustrate:
The principle of sample selection for test groups: refers to the comprehensiveness of samples in each specific test group. If each group of samples is a complete mold cavity, if the model number or serial number cannot be distinguished, it conforms to the principle of randomness;
Principles of test group selection: test group grouping conforms to randomness, which means that 8 groups are randomly selected from several groups for testing;
A1, A2, A3...A8 in the chart represent the serial number of the test group;
In the chart, B1, B2, B3....B8 represent the quantity of each group of samples in the test group. When there is a model number or number, it means a complete model. When there is no model number or number, B1, B2... .B8 Each group represents 8PCS samples.
7. Quality Assurance Regulations:
Unless otherwise specified, in the contract or procurement failure, we will abide by the quality submitted to the customer, and we will follow the controlled manufacturing process to ensure that the product meets the specification requirements, and the defective batch will be submitted for return or other corrections Measures. In addition, the component materials will not be replaced or changed. When there is a change, the materials used must be submitted to the customer for approval before implementation.
7.1 Secondary recognition inspection:
If there is a major change in the manufacturing process that affects the product form or function, etc., the product quality will be guaranteed. The re-certification test will be performed according to the test sequence of the component parts, and the product test will be re-certified according to the requirements of the development product quality and reliability engineering.
7.2 Quality requirements:
If there is a bad judgment due to improper equipment test settings or operation, samples can be sent for certification again.
When a product defect occurs, corrective measures should be taken and samples should be sent again, and corrective measures should be confirmed by testing before sending samples again.
7.3 Inspection data:
Inspection test data shall be recorded, evaluated, and used as evidence of the above items.
7.4 Quality test confirmation:
Applicable to ARC quality inspection, the sample, size and function requirements of the acceptable quality standard defined and used shall be tested in accordance with the applicable product drawings and specification requirements.
7.5 Shipping preparation:
All packaging should be fully protected to avoid damage to the product during transportation, thereby affecting the appearance and function of the product.
Pre
Next
Pre
D-SUB FEMALE 9P 180°
Next
Related products
Message consultation